BDR Refuse Derived Fuel Facility, Rotherham

Client: 3SE (Shanks, Scottish & Southern Energy)
Main Contractor: Birse Civils
Package Contractors:Mansell Balfour Beatty

 

Structural Steelwork, Floor Decking & Shear Studs - 2000 Tonnes
Kingspan Topdek Composite Membrane Roof - 12500m²
Kingspan KS1000RW Composite Wall - 6500m²
Doors, Windows, Louvres, Curtain Walling
Rainwater goods and Siphonic Drainage
Mansafe Roof Access Systems
Access Hatches & Membrane Walkways

Sub-Contract value - c. £6.5M

Border Steelwork Structures provided the structural steelwork and cladding envelope for the new MBT plant at Bolton Road, Manvers.

The Main Mechanical Biological Treatment (MBT) building contains a Tipping area, Process area, a Refinement building and two 3-storey Control rooms attached to the sides.
There are also ancillary Vehicle Workshop, Substation and Visitor Centre buildings.

The BDR Waste Partnership which consists of Barnsley, Doncaster and Rotherham Councils has signed a 25 year contract for the treatment of up to 265,000 tonnes of black bag waste per year.

 

Case Study Market: Environmental